As of September 6, 2021 and for a period of two and a half months, work is being carried out on the avenue de l'Héliport to strengthen the drinking water network and provide external defense against fire in the ZAC du Grand. Bridge.
Traffic in the work area will be alternated.
The track should be made suitable for traffic, over its width, in the evenings and weekends.
We apologize for the inconvenience.
For any questions on this subject, you can contact:
Jean Michel BENEDETTO, Works Technician of the CCGST
jmbenedetto@cc-golfedesainttropez.fr
06 09 20 24 34